Friday, 20 January 2012

shooting schedule

week 1 i will film on two days for a few hours because i think i can get all the footage in that time.

week 1: Tuesday 1400-1800
            Wednesday 1400-1800


week 2 will consist of filming bits we missed or re-filming bits that didn't work to well or that didn't record correctly

week 2: Thursday 1400-1800
              Saturday  1400-1800

The equipment list for filming will include such things as Cannon 600D a tripod also some form of bag to carry most of the filming equipment and some food for the trip and water so i don't fill ill maybe hold the water in a camel bak instead of carrying bottles which would be more hassle and it reduces the amount to carry in my bag.

analysing our footage

outdoor: the were quite a few a problems with filming because there were a few people talking behind us which was picked up by the microphone, the other problems like the sun was causing a glare on the camera lens which was hard to try and remove. the last problem was cars that drove past which you can hardly change because its out of our hands.
indoor noisy: the were a lot of problems with filming indoors like their was a couple of people throwing a bottle in front the camera while talking to each other and in the back ground they were playing music and shouting.
indoor quite: there was practically nothing wrong with it accept the noise from chairs.

Friday, 13 January 2012

sound

Today we went filming to record a fake news piece in a quite area a noisy area which was really fun with Jase rob max and jake and the outdoor area was a pain to film in.

Friday, 6 January 2012

news recording

in our group there is scala (reporter) jack(reporter) and me we are filming in 877 by the plane and coffee house we need sound kit tripod camera and tape